Vision Builders / Alex Craig / 7 Aug 2019
General Drywall Inspection Checklist
Inspection score
75%
Failed items
4
Created actions
2
Company
Vision Builders
Conducted by

7th Aug, 2019

12:48 PM +08

Inspected by
Alex Craig
Jobsite / Address
314 Shorecrest Ln, Linden, PA 17744, USA
Failed items
4
Inspection / Drywall Requirements
Construction hour signs and address are posted on all job sites
No
Inspection / General Inspection
Electrical outlet maximum setback is 1/4" from drywall face and no side gaps more than 1/8" to electrical outlet
No
Photos
Actions
To do
Apply joint compunction
Inspection / Fasteners
All screws are gypsum board type “W” or "S" unless otherwise noted and long enough to penetrate a minimum of 5/8” into wood and 3/8” into steel
No
Notes
Screws used for drywall are all correct. However, some screws were driven too far and broke some surfaces of the paper face of the wallboard.
Photos
Actions
To do
Drive new screws
Inspection / Fasteners
The screw pattern on the walls is 16” for 16” on center framing and 12” for 24” on center framing
No
Photos
Actions
2
Inspection
4
2
75%
Drywall Requirements
1
80%
Construction hour signs and address are posted on all job sites
No
Gas / Electric utilities are removed (if found to be unsafe)
Yes
Permit and approved plans are on the site
Yes
Previous required inspections are signed off
Yes
Debris removed from underfloor area
Yes
General Inspection
1
1
83.33%
Gypsum shearwalls are installed per approved plans and the prescriptive wall bracing requirements
Yes
The drywall ends break over the framing
Yes
Electrical outlet maximum setback is 1/4" from drywall face and no side gaps more than 1/8" to electrical outlet
No
Photos
Actions
To do
Apply joint compunction
Joints are staggered on opposite sides of the framing members
Yes
Ceiling drywall is installed over edge of wall panel per gypsum association
Yes
Sheetrock is installed perpendicular to framing members
Yes
Fasteners
2
1
60%
All fasteners are approved gypsum board type
Yes
All screws are gypsum board type “W” or "S" unless otherwise noted and long enough to penetrate a minimum of 5/8” into wood and 3/8” into steel
No
Notes
Screws used for drywall are all correct. However, some screws were driven too far and broke some surfaces of the paper face of the wallboard.
Photos
Actions
To do
Drive new screws
The nailing pattern on walls is 8" on center at the ends and in the field. The nailing pattern on the ceilings is 7" on center at the ends and in the field
Yes
The screw pattern on the walls is 16” for 16” on center framing and 12” for 24” on center framing
No
Photos
The screw pattern on the ceiling is 12” on center for framing spaced 16” or 24” on center
Yes
Completion
Notes or any additional comments
Made some minor remarks and provided actions to immediately address the issues identified.
I confirm that all checklist items listed have been reviewed prior to submitting this form.
Name & Signature of Inspector
Alex Craig
7th Aug, 2019 1:19 PM +08