Navigate to...

Overview
Complete
JSE Garner Management Limited / 18 Dec 2018 / Bobby Welsh
Flood Risk Assessment Report Template
Inspection score
48%
Failed items
1
Created actions
0
Client / Site
JSE Garner Management Limited
Location
The Courts (Stand B), Carlisle CA1, UK
Conducted on

18th Dec, 2018

7:16 AM +08

Prepared by
Bobby Welsh
Failed items
1
Audit / Pluvial runoff
Risk Rating
High
Photos
Audit
1
48%
FLOOD RISK ASSESSMENT
General Information
What is the flood zone of the site being assessed?
Zone 2
Flood level
12 ft
Is the site protected by flood defences?
Yes
Notes
flood defences are installed to control potential negative effects of flood waters.
Photos
Fluvial
66.67%
Description
The River Thames lies approximately 7 km southeast of the site.
Risk Rating
Low
Coastal/Tidal
33.33%
Description
The site is elevated above the 200-year tidal floodplain.
Risk Rating
Medium
Canals
66.67%
Description
The Oxford Canal is located approximately 805 m southwest of the site.
Risk Rating
Low
Photos
Groundwater
33.33%
Description
The site is shown to fall within an area predicted to be at a medium susceptibility to groundwater flooding.
Risk Rating
Medium
Reservoirs and Waterbodies
66.67%
Description
The site is shown to fall outside of the area at risk of reservoir failure. Therefore there is no flood risk posed from this flood source.
Risk Rating
Low
Pluvial runoff
1
0%
Description
The site lies within Carlisle Critical Drainage Area due to the high risk of surface water flooding in the area.
Risk Rating
High
Photos
Sewers
33.33%
Description
The site lies within Carlisle Critical Drainage Area due to the medium risk of sewer flooding in the area.
Risk Rating
Medium
Effect of Development on Wider Catchment
100%
Description
There will be no impact on existing run-off rates as a result of development.
Risk Rating
None
COMPLETION
0%
Overall RIsk Rating
At Risk
Recommendations
In order to mitigate any residual risk from overland sources, it is recommended that where possible finished floor levels are raised/maintained at least 200mm above external levels. It is also recommended that external levels are arranged so as to divert flow away from the building entrance and reduce the risk posed to the lower basement level.
Full Name and Signature of Inspector
Bobby Welsh
20th Dec, 2018 8:05 AM +08
Photos